
Construction dumpster rental in Las Vegas
What roll-off container do you need for a Las Vegas jobsite? A 30-yard roll-off keeps the debris moving: swap-outs on demand and driveway boards included.
Jobsite Roll-off Containers for General Contractors
Our construction fleet runs 20-, 30-, and 40-yard roll-offs across the Las Vegas metro and Clark; these containers feature reinforced steel sidewalls, walk-in rear swing doors, and steel bottom rollers for framers, roofers, and demo crews. We set every bin on driveway boards to protect your pavement. Call (702) 789-6533 for contractor pricing and tonnage rates on multi-phase commercial hauling agreements.

20-yard construction roll-off
The 20-yard roll-off measures 20 feet long, 7 feet wide, and 4 feet tall, with about 2 tons of debris included in the flat rate.
This 20-yard roll-off fits kitchen and bath remodels, single-room demo, and small framing jobs in tight spaces.

30-yard construction roll-off
The 30-yard roll-off runs 22 feet long, 8 feet wide, and 6 feet tall, with about 4 tons of capacity included.
The 30-yard container fits whole-house remodels, additions, and new-build framing with high walls to handle bulky drywall and lumber.

40-yard construction roll-off
The 40-yard roll-off stretches 22 feet long by 8 feet wide and stands 8 feet tall, with about 5 tons included on the haul.
Sized for commercial builds and large tear-outs, the 40-yard roll-off is the largest container we stage on jobs.
Construction Debris, Drywall, Lumber Acceptance
Our construction roll-off containers accept the full range of mixed C&D debris: framing lumber, drywall, plaster, subfloor, insulation, packaging, pallets, and light metals. Material is sorted at the Las Vegas transfer station—maximizing recovery before the remainder hits the landfill. Contractors on rolling jobs often manage these loads through commercial recurring hauling agreements, while referring to EPA construction debris recycling guidance for standard material-stream management. Call (702) 789-6533.
- ✓ Framing lumber and offcuts
- ✓ Drywall, plaster, lath
- ✓ Subfloor and sheathing
- ✓ Insulation and vapor barrier
- ✓ Mixed packaging and pallets
- ✓ Light metals and conduit


Concrete, Brick, and Asphalt Heavy-debris Pricing
Dense loads call for the right container. Our reinforced-steel lowboy roll-offs handle concrete slab tear-out, brick demo, asphalt millings, and clean dirt loads up to 10,000 pounds without flinching. The low 2-to-3-foot side walls let a skid steer or wheelbarrow tip debris straight in without crowding the truck past USDOT weight limits on Las Vegas routes.
Heavy-debris jobs run on a weight ticket from the scale house, not by the yard; clean loads—those with no mixed drywall or trash—earn the lowest per-ton rate. I coordinate your container based on a quick call with the site super, and the final dumpster billing reflects the recorded tonnage.
Tonnage Limits and Weight Overage Policy
Every construction roll-off includes a set tonnage allowance: additional weight is billed at our per-ton overage rate against the scale-house ticket. Our upfront quote clarifies the limit for each container—so there are no surprises when the truck weighs in; heavy shingles from a roofing tear-off jobsite containers should be managed separately so that specific material weight does not consume your general mixed-debris allowance.
20-yard
3 tons
Included tonnage. Mixed C&D debris.
30-yard
4 tons
Included tonnage. Mixed C&D debris.
40-yard
5 tons
Included tonnage. Mixed C&D debris.
On-site Swap-out and Dispatch Coordination
Multi-week jobs run on a swap-out rhythm; not single drops. Text or call dispatch when a container is full — and we’ll roll a fresh roll-off to the same staging pad on the same or next business day across the Las Vegas metro and Clark.
Step 1
Text dispatch when full
Site supers text a photo and the container number to the dispatcher — no portal logins, no ticketing.
Step 2
Same- or next-day swap
We haul your full container and drop an empty on the same staging pad so the crew never loses a loading hour.
Step 3
Weekend dispatch available
Saturday pulls keep Monday starts clean; coordinate Friday afternoon for weekend turns.

Insurance and Contractor Account Setup
Contractor accounts get certificates of insurance issued to the GC or property owner; we run net-30 terms with one consolidated monthly bill across Las Vegas active sites — the hooklift fleet stages recurring bins until the project ends.